1973-Present

  1. Calander Year 1973


    Allied Engineers (AE) was founded by Mr. Subhash Khera after re-locating from the Canadian oil patch to India, with the sole aim of bringing the latest global oil and gas specialised technologies to India.

    Logo
  2. Calander Year 1981


    Initiative was taken to induct the Canadian oil and gas Well Stimulation technologies for ONGC & OIL by conducting seminars. This prompted ONGC to launch their Well Stimulation Services [WSS] department by procuring equipment in excess of 10 Million dollars as well as transfer of technology from our principals M/s Nowsco Well Services, Canada.

  3. Calander Year 1985


    For development of ONGC Bombay High, our principal M/s Site Oil Tools, Canada and M/s Hughes Production Tools, USA provided downhole completion tools as well as liners.

  4. Calander Year 1988


    Our principals, M/s Subsea International, UK provided Remotely Operated underwater Vehicles [ROV’s] and technology for repairing offshore leaks in Bombay High.

  5. Calander Year 1992


    Extensive supplies of Fracturing, Coil Tubing, and Nitrogen Pumping units to Oil and Natural Gas Corporation [ONGC] Eastern Region and Oil India Limited [OIL], Assam.

    Logo
  6. Calander Year 1995


    In North East India, performed Intelligent Pigging (ILI) for over 1,400+ km of pipeline along with our principal M/s Pipetronix Ltd., Canada.

    Logo
  7. Calander Year 2002


    Supplied customized package for recovery of Coal Bed Methane through our principals M/s Crown Industries, Canada for Coal India through UNIDO projects.

    Logo
  8. Calander Year 2004


    For our Indian clients conducted SCC Susceptibility studies and System wide Coating Integrity programs totalling more than 3,400 km of pipeline.

    Logo
  9. Calander Year 2010


    Completed a 5 year program initiated in 2005 with Kuwait Oil Company (KOC) providing Integrity Management services and conducting Direct Assessment for more than 200 non-piggable pipelines. This wais part of the Total Pipeline Integrity Management System (TPIMS) program with Tuboscope Pipeline Services, USA and Kuwait Oil Company (KOC).

    Logo
  10. Calander Year 2011


    India’s 1st ever turnkey Direct Assessment (DA) -using ECDA, ICDA, SCCDA for non-piggable lines

    Logo
  11. Calander Year 2012


    Kuwait Oil Company (KOC) Research & Technology (R&T) appoval for ICDA success for a Wet Gas system, which led to AE’s multi-year ICDA contracts with KOC

    1st Direct Assessment (DA) course was taught by AE’s Director at NACE International, Houston after being one of the lead co-authors for developing the course over the past 2 years for NACE.

    Logo
  12. Calander Year 2014


    OISD hired AE services to provide training on Direct Assessment (DA) to the Indian oil and gas pipeline operators

    Logo
  13. Calander Year 2015


    Ultrasonic Crack Detection In-Line Inspection for 1,000 + Km pipeline by our principals NDT Global, Germany (India’s 1st ever).

    Logo
  14. Calander Year 2017


    Introduced services for advanced integrated CP & Coating Surveys with eXternal Line Inspection (XLI) from PureHM, Canada. Already performed for 300+ pipelines of 3,500 + Kms

    For our North American client, Trans Canada Pipelines Limited (TCPL) conducted SCC modelling and reporting for over 60 pipelines which total more than 4,000 km with yearly program over the past 9 years, since 2008.

    Logo
  15. Calander Year 2019


    City gas In-Line Inspection for Non-piggable pipeline along with our principals Quest Integrity, USA (India’s 1st ever)

    Awarded a five (5) year PIMS (Pipeline Integrity Management Software) contract with Probabilistic Risk Assessment from ONGC for all related software and field services in Western Region, India

    SCCDA performed for 400+ kms pipeline network of Net4Gas in Czech Republic

    Logo
  16. Calander Year 2020


    Turnkey ECDA, ICDA and SCCDA for 50+ non-piggable pipelines without CP system in place (India’s 1st ever)

    Logo
  17. Calander Year 2022


    Completed Turnkey Stress Corrosion Cracking Direct Assessment (SCCDA) program for Saudi Aramco Pipeline

    Logo

60+ Asset Integrity Programs Completed

  • Clock Spring

    Clock Spring

    + Pipelines

    + repairs
  • Direct Examination

    Direct Examination

    DEx

    sites
  • ECDA

    ECDA

    Pipelines

    Km
  • ICDA

    ICDA

    Pipelines

    Km
  • ILI

    ILI

    Pipelines

    Km
  • SCCDA

    SCCDA

    Pipelines

    Km
  • XLI

    XLI

    Pipelines

    Km
Country Job Period Category Sub-Category
Saudi Arabia 2022 Integrity Assessment SCCDA
UAE 2021 ECDA IDi XLI (Integrated CP+Coating Survey)
India 2021 Integrity Assessment ICDA / ECDA / SCCDA
Kuwait 2019 ECDA IDi XLI (Integrated CP+Coating Survey)
Czech Republic 2019 Integrity Assessment SCCDA