1973-Present
Year 1973Allied Engineers (AE) was founded by Mr. Subhash Khera after re-locating from the Canadian oil patch to India, with the sole aim of bringing the latest global oil and gas specialised technologies to India. |
Year 1981Initiative was taken to induct the Canadian oil and gas Well Stimulation technologies for ONGC & OIL by conducting seminars. This prompted ONGC to launch their Well Stimulation Services [WSS] department by procuring equipment in excess of 10 Million dollars as well as transfer of technology from our principals M/s Nowsco Well Services, Canada. |
Year 1985For development of ONGC Bombay High, our principal M/s Site Oil Tools, Canada and M/s Hughes Production Tools, USA provided downhole completion tools as well as liners. |
Year 1988Our principals, M/s Subsea International, UK provided Remotely Operated underwater Vehicles [ROV’s] and technology for repairing offshore leaks in Bombay High. |
Year 1992Extensive supplies of Fracturing, Coil Tubing, and Nitrogen Pumping units to Oil and Natural Gas Corporation [ONGC] Eastern Region and Oil India Limited [OIL], Assam. |
Year 1995In North East India, performed Intelligent Pigging (ILI) for over 1,400+ km of pipeline along with our principal M/s Pipetronix Ltd., Canada. |
Year 2002Supplied customized package for recovery of Coal Bed Methane through our principals M/s Crown Industries, Canada for Coal India through UNIDO projects. |
Year 2004For our Indian clients conducted SCC Susceptibility studies and System wide Coating Integrity programs totalling more than 3,400 km of pipeline. |
Year 2010Completed a 5 year program initiated in 2005 with Kuwait Oil Company (KOC) providing Integrity Management services and conducting Direct Assessment for more than 200 non-piggable pipelines. This wais part of the Total Pipeline Integrity Management System (TPIMS) program with Tuboscope Pipeline Services, USA and Kuwait Oil Company (KOC). |
Year 2011India’s 1st ever turnkey Direct Assessment (DA) -using ECDA, ICDA, SCCDA for non-piggable lines |
Year 2012Kuwait Oil Company (KOC) Research & Technology (R&T) appoval for ICDA success for a Wet Gas system, which led to AE’s multi-year ICDA contracts with KOC |
Year 2014OISD hired AE services to provide training on Direct Assessment (DA) to the Indian oil and gas pipeline operators |
Year 2015Ultrasonic Crack Detection In-Line Inspection for 1,000 + Km pipeline by our principals NDT Global, Germany (India’s 1st ever). |
Year 2017Introduced services for advanced integrated CP & Coating Surveys with eXternal Line Inspection (XLI) from PureHM, Canada. Already performed for 300+ pipelines of 3,500 + Kms |
Year 2019City gas In-Line Inspection for Non-piggable pipeline along with our principals Quest Integrity, USA (India’s 1st ever) |
Year 2020Turnkey ECDA, ICDA and SCCDA for 50+ non-piggable pipelines without CP system in place (India’s 1st ever) |
Year 2022Completed Turnkey Stress Corrosion Cracking Direct Assessment (SCCDA) program for Saudi Aramco Pipeline |
Country | Job Period | Category | Sub-Category |
---|---|---|---|
Saudi Arabia | 2022 | Integrity Assessment | SCCDA |
UAE | 2021 | ECDA IDi | XLI (Integrated CP+Coating Survey) |
India | 2021 | Integrity Assessment | ICDA / ECDA / SCCDA |
Kuwait | 2019 | ECDA IDi | XLI (Integrated CP+Coating Survey) |
Czech Republic | 2019 | Integrity Assessment | SCCDA |