C-FER Technologies and Allied Engineers team up to provide end-to-end pipeline risk Management SolutionsC-FER Technologies and Allied Engineers are partnering to provide a Pipeline Integrity Management System (PIMS) to India’s Oil and Natural Gas Corporation (ONGC). The project brings together Allied Engineers’ pipeline integrity... |
The Maharaja Mac and XLI; Now Both Available to Indian Pipeline Operators!While his home in Houston was on the brink of flooding, Marcus McDonnell was half way around the globe in India; eating a Maharaja Mac! Marcus is a man of few words, so all he had to report was “I had an Indian Big Mac today… chicken instead of beef, jalapenos instead of pickle, orange curry sauce instead of white mystery sauce. LOL” |
Year | Publishing Authors | Title | Category |
---|---|---|---|
2021 | AE / MRPL | Complete Integrity Assessment of a Non-Piggable Multi-Diameter Cross Country Pipeline in a Network Shared By Multiple Electrically continuous Parallel Pipelines |
ICDA / ECDA |
2021 | AE / OIL | Utilization of High Resolution Integrated Indirect Inspection Survey Technologies aspart of the Direct Assessment (DA) methodology of ageing Non-CP PipelineNetwork |
ECDA / CP |
2019 | AE / CAIRN INDIA | Integrated Survey for Cathodic Protection & Coating during ECDA of 4" Condensate Pipeline |
ECDA / CP |
2019 | AE | Current industry gaps within CP and Coating Surveys | CP |
2019 | AE / IOCL | Development of an internal corrosion management plan for a gas pipeline containing black powder |
ICDA |